|

<Photo Gallery
of Award-Winning Steel Bridges>
1.AISC Prize Bridge
Award (1993)
 |
 |
 |
 |
Reconstructed Bridge Part
( Belle Vernon Bridge)
|
Medium Span,
High Clearance Part
(Alsea Bay Bridge Replacement)
|
Medium Span,
High Clearance Part
(Lawyer's Canyon Bridge)
|
|

|

|

|
Medium Span,
Low ClearancePart
(Flaming Geyser Bridge No. 3024 )
|
Short Span Part
(Bridge No.13010 Over Paulins Kill Creek)
|
Special Purpose Part
(Veterans Administration Skybridge)
|
|
2.Steel Bridges :
Japan
 |
 |
 |
 |
Shinonomichi Bridge
(Cable Stayed Bridge)
|
Seto Bridge
(Suspension Bridge)
|
Sibsung Bridge
(Cable Stayed Bridge)
|
|

|

|
Dong Sin Ho Bridge
(Cable Stayed Bridge)
|
|
|
3.Winners of POSCO
Steel Structure Awards ('94~2000)
 |
 |
 |
 |
|
1994 : EXPO Bridge
(Medal of Excellence)
Samwoo Tech.
|
1995 : Gupo Bridge (Runner-Up)
Samsung Heavy Industries Co.,
Ltd.
Marine Bridge Division
|
1996 : Han River Steel Coated
Bridge
(D-line) (Gold Medal)
Kang-Hee Choi
(Director of Railway Technology Asso.)
|
|

|

|

|
|
Soyang 2 Bridge (Silver)
Namwon Civil Engineering
|
Changsun Bridge (Bronze)
Yooshin Civil Engineering Corporation Ltd.
|
Dong Bridge (Bronze)
Kunwha ENG.
|
|

|

|

|
|
1997 : Sogang Bridge (Silver)
Korea Civil Engineering Consultants
Corporation
|
Wonju Bridge (Bronze) Kukdong
Construction and Civil Engineering Co.
|
1998 : Shinho Bridge (Silver)
Seoyoung Tech.,Ltd.
|
|

|

|

|
|
Gwangyang Art Hall Pedestrian
Bridge Model (Special Prize)
POS- Architects & Consultants
|
1999 : Tongyoung Bridge(Gold)
Dongmyung Tech.& Eng., Ltd.
|
Incheon Port Connecting Bridge
and Fixed Structure(Bronze)
Daeyoung Civil Engineering Co.,Ltd.
|
|

|

|
|
2000 : Hantan Bridge (Silver)
Kisan Civil Engineering
|
Jungsan1,2Bridge (Bronze)
Hana Structures : Uncoated
Weathering Steel
|
|
|